The formwork is completed (18 November 2005)
The formwork is completed, and the reinforced steel is laid. I will explain the technical bits in a later post, but these are some of the photos after we finished the preparation. I am SO excited not to have to do any more digging!!! Next week we will get the concrete truck, and pour the foundations. Woo-hooo!!!!
![](http://photos1.blogger.com/blogger/645/1324/320/PB180011.jpg)
This is the preparation for the water feature foundation.
The black pit will house the equipment (pump, etc).
![](http://photos1.blogger.com/blogger/645/1324/320/PB180008.jpg)
This is the formwork for the side of the house. It was
the most complex of the lot, as it has a very deep
foundation to assist with proper ventilation and
avoid humidty problems.
![](http://photos1.blogger.com/blogger/645/1324/320/PB180011.jpg)
This is the preparation for the water feature foundation.
The black pit will house the equipment (pump, etc).
![](http://photos1.blogger.com/blogger/645/1324/320/PB180008.jpg)
This is the formwork for the side of the house. It was
the most complex of the lot, as it has a very deep
foundation to assist with proper ventilation and
avoid humidty problems.
0 Comments:
Post a Comment
<< Home